Projects News in Details
Patel+Engineering+bags+new+order+of+Rs+2%2C461+cr+from+Chenab+Valley+Power+Projects Print Article

Patel Engineering bags new order of Rs 2,461 cr from Chenab Valley Power Projects

May 14, 2022
Patel Engineering, a Premier civil construction Company specialised in the hydropower sector, has announced that it has bagged a Rs2,461 crore contract for the works of Construction of Diversion Tunnel, Concrete Gravity Dam, Intake, Pressure Shafts, Underground Power House & Tailrace Tunnel (Lot 1) for Kwar HE Projects in District Kishtwar, J & K, India (Kwar HE Project).

The Kwar HE Project is being executed by Chenab Valley Power Projects Limited, a Joint Venture of NHPC Limited (a Govt of India Enterprise) & JKSPDC (a Govt of J & K Enterprise) (the Authority) to harness the vast hydro potential of river Chenab. Hon’ble Prime Minister laid the foundation stone of Kwar HE Project.

Kwar HE Project is a run-of-river scheme with a Concrete Gravity Dam located at District Kishtwar of J & K. The Project envisages construction of 109m high concrete gravity dam above deepest foundation across river Chenab of length 195m at top. Kwar HEP is a 540MW (4x 135 MW) project with estimate generation of 1975.54 MU (in a 90% dependable year).

The Letter of Acceptance for the Contract is issued by the Authority and the works are scheduled to be completed in a period of 48 months as per the Contract terms. The Company already has three ongoing projects in the nearby Vicinity in the J&K State with similar geological terrains which is an added advantage for execution of this new Project.

Patel Engineering ended at Rs22.05 apiece up by Rs1.05 or 5% from its previous closing of Rs21 apiece on the BSE.

Advertisement
Advertise here